Texas Instruments TRF1213EVM Evaluation Module
Texas Instruments TRF1213EVM Evaluation Module evaluates, controls, and configures the TRF1213 RF amplifier. The TRF1213 is a single-ended input-to-differential output RF amplifier available in a 2mm x 2mm, 12-pin WQFN package. The TI TRF1213EVM is ideal for AC-coupled applications that demand a single-ended to differential conversion when driving an RF sampling analog-to-digital converter (ADC).Features
- Operates on a single 5V supply
- Simple interface to the input and outputs through onboard SMA connectors
- Designed for single-ended, 50Ω input matching
- Power-down option is available onboard using a jumper
Applications
- RF sampling or GSPS ADC driver
- Aerospace and defense
- Radar seeker front end
- Phased array radar
- Military radios
- Test and measurement
- High-speed digitizers
- Vector signal transceiver (VST)
- 4G/5G wireless BTS 3
Functional Block Diagram
Layout
發佈日期: 2025-06-03
| 更新日期: 2025-06-12
