Texas Instruments TPS552892EVM-111 Evaluation Module

Texas Instruments TPS552892EVM-111 Evaluation Module is configured to evaluate the operation of the TPS552892. The TPS552892 is a synchronous buck-boost converter optimized for converting battery or adaptor voltage into power supply rails. The TI TPS552892EVM-111 incorporates four MOSFET switches delivering a compact solution for USB Power Delivery (USB PD) application.

Features

  • Input voltage range of 3.0V to 36V
  • Output voltage range of up to 22V
  • 8A average inductor current limit
  • An adjustable switching frequency of 200kHz to 2.4MHz

PCB Layout

Texas Instruments TPS552892EVM-111 Evaluation Module
發佈日期: 2023-01-24 | 更新日期: 2023-08-29