Texas Instruments TPS541620xEVM Evaluation Modules

Texas Instruments TPS541620xEVM Evaluation Modules are configured to evaluate the operation of the TPS541620. The TPS541620 is a dual, internally compensated step-down converter in a 3mm x 5mm package with two outputs that can be configured as two single rails or combined to drive a single higher current rail. The TI TPS541620DEVM-050 Evaluation Module provides 6A, while the TPS541620SEVM-050 offers 12A.

Features

  • 3.7V to 16V input voltage, 12V nominal
  • Fixed frequency ACM control
  • 500kHz to 2000kHz switching frequency (1000kHz default setting)
  • TPS541620DEVM-050: dual output: 1V at 6A and 3.3V at 6A
  • TPS541620SEVM-050: 2-phase interleaved: 1V at 12A

Applications

  • Wired and wireless infrastructure equipment
  • Ethernet switches
  • Router network
  • ASIC, SoC, FPGA, DSP I/O Voltage rails
  • Industrial test and measurement equipment

PCB Layout

Texas Instruments TPS541620xEVM Evaluation Modules
發佈日期: 2020-12-23 | 更新日期: 2024-10-28