Texas Instruments TAA3020EVM-PDK Evaluation Module
Texas Instruments TAA3020EVM-PDK Product Development Kit (PDK) is designed to quickly and easily demonstrate the capabilities of the TAA3020, a stereo-channel, high-performance Audio ADC. The TAA3020 is intended for voice-activated systems, professional microphones, audio conferencing, portable computing, communication, and entertainment applications.The TI TAA3020EVM-PDK product development kit is paired with the AC-MB, a flexible motherboard that provides power, control, and digital audio data to the evaluation module.
Features
- Complete evaluation kit for the TAA3020 two-channel ADC
- Low-cost stereo ADC dynamic range of 104dB
- Direct access to digital audio signals and control interface for simple end-system integration
- On-board microphones provided for voice recording testing
- USB connection to PC provides power, control, and streaming audio data for easy evaluation
Applications
- Smart speakers
- IP network cameras
- Professional microphones and wireless systems
- Video conference systems
Kit Contents
- TAA3020 device
- TAA3020 EVM/daughterboard
- AC-MB controller/motherboard
TAA3020EVM-PDK & AC-MB Boards
AC-MB Audio Serial Interface Routing
Input Architecture
發佈日期: 2025-02-18
| 更新日期: 2025-04-23
