Texas Instruments LMR51606EVM Evaluation Module
Texas Instruments LMR51606EVM Evaluation Module facilitates the evaluation of the LMR51606 step-down converter. The fully assembled and tested circuit offers a 3.3V output with a wide input range of up to 65V, 0.6A loading current, and an internal fixed frequency. Additionally, the TI LMR51606EVM Evaluation Module has AC signal injection terminals for loop measurements.Features
- 4V to 65V input voltage range
- 3.3V output
- Up to 0.6A output current
- Switching frequency 1100kHz
Layout
發佈日期: 2023-11-07
| 更新日期: 2023-11-24
