Texas Instruments LMH6518EVM Evaluation Module (EVM)

Texas Instruments LMH6518EVM Evaluation Module (EVM) is designed to aid in characterizing Texas Instrument's High-Speed LMH6518 Differential Amplifier. The easy-to-use evaluation board is designed to provide a quick setup and offer high-performance signal analysis. The Texas Instruments LMH6518EVM is ready to connect to power supplies, a signal source, and test instruments through onboard connectors.

Features

  • Designed to work with a user-friendly USB2ANY interface adapter and GUI
  • The board is designed to be easily reconfigurable for different types of testing conditions
  • The onboard potentiometer is provided to null any output offset
  • Onboard LDO provides the required 3.3V supply for the VDD pin of the LMH6518, requiring only one 5V supply
  • Inputs and outputs include SMA connectors
  • Designed for connections to standard 50Ω test equipment

Kit Contents

  • LMH6518EVM evaluation module
  • Two shunt jumpers
  • ReadMe disclaimer

Applications

  • Oscilloscope programmable gain amplifiers
  • Differential ADC drivers
  • High-frequency single-ended input to differential conversion
  • Precision gain control applications
  • Medical applications
  • RF/IF applications

Board Layout

Mechanical Drawing - Texas Instruments LMH6518EVM Evaluation Module (EVM)
發佈日期: 2024-12-13 | 更新日期: 2024-12-23