Texas Instruments LM5168PEVM Regulator Evaluation Module (EVM)
Texas Instruments LM5168PEVM Regulator Evaluation Module (EVM) is a fully assembled and tested circuit for evaluating the LM5168P. The LM5168P is a 115V DC/DC fly-buck regulator that employs synchronous rectification to achieve high conversion efficiency in a small footprint. The Texas Instruments LM5168PEVM operates over a wide input voltage range of 20V to 115V to provide a regulated 12V output at up to 0.3A with a 500kHz switching frequency.Features
- Integrated synchronous rectification
- Low operating quiescent current
- High efficiency at light loads
Board Layout
發佈日期: 2022-09-27
| 更新日期: 2022-10-06
