Texas Instruments JFE150EVM JFET Evaluation Module (EVM)
Texas Instruments JFE150EVM JFET Evaluation Module (EVM) is intended to provide an essential functional evaluation of the JFE150 device. The Texas Instruments JFE150EVM is configured in a closed-loop pre-amplifier configuration providing 60dB of gain on a single 12V supply. User modifications can be made for a variety of circuit configurations.Features
- JFE150 Ultra-Low-Noise Pre-Amp default configuration
- BNC connections for input and output
- Convenient test points to all pertinent nodes
- Resistor and capacitor through-hole and surface mount pad options for critical signal paths
- Banana plug connections for power supplies and bias nodes
Boardf Layout
發佈日期: 2022-04-26
| 更新日期: 2022-06-03
