Texas Instruments BOOSTXL-TLC6948EVM Driver Evaluation Module
Texas Instruments BOOSTXL-TLC6948EVM Driver Evaluation Module (EVM) is a reference for engineering demonstration and evaluation of the TLC694x family. The TLC694x family are 16-channel 32-, 48-multiplexing 16-bit ES-PWM constant-current LED drivers with QFN package. The Texas Instruments BOOSTXL-TLC6948EVM uses three TLC694x VQFN package devices to drive 16 RGB LEDs, each controlling one color. The evaluation module also provides the function to verify LED-Open Detection (LOD) and IREF Resistor Short Protection (ISP).Features
- Built-in 16Kbit memory supports 32-multiplexing
- Enhanced circuit for LED display performance improvement
- Integrated high-speed serial data interface
- Diagnostics and protection
- Intelligent power-save mode
Applications
- Mono-color, multi-color, full-color LED displays
- High-refresh-rate LED video displays
- High-density, fine-pitch LED matrix boards
- LED sign boards, message boards
- Variable message signs (VMS)
Board Layout
發佈日期: 2019-04-05
| 更新日期: 2023-08-17
